Place :
HigashiKurume-City, Tokyo
Dimension : two storied house, 47tsubo
Structure : Wooden
Architect & Supervision :
A.TERA architect &associates
Designing term : Jan/04 - Oct/05
Constructor : Aiba-kensetsu co.,Ltd.
Construction term : Jan/06 - Jul/06
|
|
 |
| 27/Oct/06 |
| The
final debriefing session of construction
About two month have passed since
Futaki skin care clinic started in the new building.
We had the final debriefing session of construction
when Dr. Futaki settled into a rhythm of usual
day.
They have worked here since September, so we could
listen to impression of the building and some
new requests.
We are glad to hear that the clinic is running
smoothly.
|

|
| 1/Sep/06 |
|
"Futaki Skin Care Clinic"
The new clinic has opened.
Though a lot of patient visited there in the first
day morning, the clinic could start attending
without any problem. Dr.Futaki who couldn't sleep
the previous day because of the preparation seemed
to be relieved.
|

|
| When
tree planting at the exterior has finished, the
white building shined more because of the green. In
front of the two symbolical tree that are associated
with the name of Dr."Futaki(two trees)",
we took a memorial picture. They are dogwoods that
we chose at a gardener in August, one flower color
is white and the other one is red. They must be
given a various view as their changes from season
to season. |
|
27/Aug/06
|
|
Hand over examination
A lest of the construction of interior has finished,
we examined for handing it over. About the completed
building, we checked again about three basis items,
whether there is any black spot and any functional
problem, and its workmanship.
Futaki Skin Care Clinic starts
diagnosis at the new clinic on 1st of September.
From this sunday, all of staff had started carrying
their things into the new clinic and rearranged.
The day when the new clinic
starts is coming soon.
|

|
| 24/Aug/06 |
|
Select of plants
In front of the entrance of the clinic, we are
going to plant two of symbolical trees that associated
with the name of Dr."Futaki (two trees).
Mrs. Futaki and I went to a gardener in Akitsu,
and we looked real tree then chose them. Finally
we selected two dogwoods one of them are red flower
and another one are white.
|
 |
| 11/Aug/06 |
|
Inspection for permission of
set up the clinic
The building passed off the inspection of finishing
by Tama building guidance section and also had
inspection for getting a permission of set up
the clinic by healthcare center today. In this
inspection, they check whether the consultation
room has been took the position that was as planned,
or whether there are some outlet for medical use.
It also passed off without point out any mistakes.
At the construction site, there are still being
constructed of lest and exterior. The
schedule when the clinic move into the new one
is 1st of September.
|
 |
| 24/Jul/06 |
|
Each finishing
After the each finishing construction of the interior,
the installation of lighting, air conditioning
and electrical apparatus is also completed, it
is nearly completed.
This time there are two clinic rooms, usual one
and the other one is able to have laser treatment.
These are little bit different to use, we planed
the interior are different. This is the room formed
the keynote of white color regarded cleanliness
(the top picture). To the patients are able to
relax, the room use for laser treatment is taking
frost glass to take in the soft light (the bottom
picture).
The construction has been going well, we are scheduling
a inspection of finishing on 27th.
|

|
| 29/Jun/06 |
|
Facade
Dismantling of the scaffolding has finished, the
building showed off the shape. It is easy to find
from far away, it's because of the facade with
white-plastered wall and galvanized steel iron,
it is also serve for the sign of the clinic. Mr.
futaki is satisfied with its' finish matched as
his images. The construction of the exterior
is going to move the next action.
|
 |
| 23/Jun/06 |
|
Finishing
For the exterior, plaster work of the wall has
completed. Before the scaffolding was taken off,
we did a final check about the condition of the
plaster work and whether constructor got a task
right such as cauking around the sash. The result
was well, the finishing was as our images.
In the next week, the scaffolding will be dismantled
as the plan. The interior construction is also
becoming finish. Finish to cover the walls and
the ceiling of the house with wallpaper, plaster
work will be gin of interior wall of consultation
room from now on.
|

|
| 7/Jun/06 |
|
Built-in furniture
We designed most furniture such as documents and
medicines shelf, sink cabinets of a consulting
room to convenience and fit size. Built-in furniture
has been nearly completed, we are going to start
coating with paint after this.
The construction is advancing
for hand over of the end of July smoothly.
|
 |
| 12/May/06 |
|
A storage utilize the stairs
Dr.futaki has a lot of books related to medical
treatment and collected his hobby. Therefore we
devised the stairs which connects to the loft.
We use dead space to have some shelf, as we extend
the steps of the stairs to the wall.
|
 |
| 1/May/06 |
|
Exterior wall construction
Galvanized steel iron set up construction of the
exterior wall has finished. As for the part of
the external corner, there is a method that hold
down a steel plate by using a ready-made metal.
But the ready-made metal is too wide to use for
this building of longitudinally-extending, so
we made the 10mm narrow downed parts. An impression
is quite different in even only 10 millimeters.
|
 |
| 19/Apr/06 |
|
Regular meeting, site confirmation
We inform the owner, Dr. Futaki & his wife
of supervision of construction work of last month,
and let them confirm the progress of the current
construction once every month.
After the meeting, Dr. Futaki
and we confirm the site. The photograph is a sky
light of a washroom in the second floor. It seems
to become open bright space.
|
 |
| 27/Mar/06
|
|
Indoor wiring work
A lath base was set in the outside and showed
outline.
The inside began indoor wiring
work and plumbing, air conditioning. An air-conditioner
to bury in a ceiling installs it by this process.
It is in a corner lot and surrounded by three
roads, so we make consideration that plumbing
do not appear in a part becoming a face of a building.
|

 |
| 15/Mar/06 |
|
Fit up sash
Sash install construction has started. We reconfirmed
whether the opening as planed was not coincide
with neighbors' windows at the scene. According
to plan, there were not any problems.
This is the balcony at the second
floor. Even in this season, there had a brilliant
sunshine so it was used as a resting place for
the carpenters. It might be becoming a comfortable
space.
|

 |
| 3/Mar/06 |
|
Completion of framework
The second floor part of this building consists
of two buildings that sandwiched a courtyard.
In other words, it is a workload to be able to
call completion of framework of two houses, so
the worker worked together for the framework-rising
ceremony of the evening from 7:00 a.m. In the
twilight, the ceremony held without accident.
|

 |
|
Naorai(A feast after the ceremony)
Dr. Futaki and his wife talked to us about appreciation
to the worker and their thought for this new home.
The carpenters, workers, constructor and we gave
them a present of message written in a piece of
wood that was in the construction site. They were
pleased very much with it that become in commemoration
of the ceremony.
|
| 15/Feb/06 |
|
The layout of reinforcement
inspection
We checked whether metal such as reinforcing rods
or an anchor bolts has been placed as planed. After
a fine adjustment, the constructor cast concretes
into there. It is fine today as temperature rises
to 18 degrees in the daytime, it is like April
climate. But the weather forecast says tomorrow
will be rain. Because of casting concrete can't
be done in the rain, it will be postponed until
the following day to be safe.
|
 |
| 10/Feb/06 |
|
Casting of the levelling concrete
As excavation and Harden the ground has completed,
the levelling concrete was cast to the ground.
Construction is being carried out smoothly for
completion of framework at the beginning of March.
|
 |
| 31/Jan/06 |
|
Checking the Rope to set up
the building position
The rope was set up along building line. We confirm
dimensions of the interval between the rope and
property line and road border, and a position
of a building. When build constructions from now
on, it becomes an important point of judging whether
there is or not a problem.
|
 |
| 25/Jan/06 |
|
Ceremony for sanctifying ground
With attendance of the Futaki family, his clinic's
staff, the constructor and us, the ceremony was
held by Suwa shrine and prayed for safety completion
of the building.
Finally, the construction will
start.
|
 |
| 16/Jan/06 |
|
The demolition work
The demolition work that began on January 10 is
going to complete for more few days. Pursuant
to "Construction Material Recycling Act",
they separate aluminum and plastic materials.
|

 |
|
The temporary clinic
The clinic was inspected by healthcare center
in last December and opened temporarily the clinic
on January 6. Dr. Futaki had been opened his clinic
at this place before moving to the dismantling
one, and it is a good old place to patients from
old days.
|
| 29/Dec/05 |
|
Rice cake making party
We had been asking for the estimate from several
constructors in October, as a result of adjustment
and discussion, we decide to contract with Aiba-kensetsu
which is in Higashimurayama-city, December 26th.
Dr. Futaki and his wife who are the client and
I joined in annual rice cake making party of Aiba-kensestsu,
on December 29th. (the picture on the right :
From left, Sato managing director of Aiba -kenestsu,
Mrs.Futaki)
We were treated like a pig roasted whole, a hot
guts meet pod and steamed rice and more. A rice
cake just made is different from a rice cake on
public sale and there is elasticity, lengthens
and is delicious at all.
Staff of Aiba-kensetsu made rice cake all the
time from morning to the night and seems to have
steamed almost 200 liters of glutinous rice. The
old and new clients and construction workers visited
continuously, it was prosperous.
After two years of the design, the construction
will start finally from the next year. At first
they begin with dismantling construction of an
existing clinic.
|


 |